First, soil is removed from the area where the helical pier will be installed, and then secretion are advanced into the soil. Once the proper depths and capacities are achieved, heavy-duty foundation brackets are positions below the footing. The weight of the home is then transferred through the helical pier to deep competent soils. Lifting the home back toward its original position is attempted, and the soil around the installation is replaced.